Stella’s Status Report for December 6, 2025

Note: Our team has compressed our images and videos, but the media upload quota is still full, so this report does not have photos that we would have liked to attach.   A lot has gone on over the past two weeks.  I created a frame for mounting the battery, Read more…

By stellai, 2 weeks ago
Stella's Status Reports

Stella’s Status Report for November 22, 2025

Note: Our team has compressed our images and videos, but the media upload quota is still full, so this report does not have photos that we would have liked to attach. This week, our group finished out MVP prototype manufacture for the SNIFF Visor. We put together the different parts Read more…

By stellai, 4 weeks ago
Stella's Status Reports

Stella’s Status Report for November 15, 2025

Note: Our team has compressed our images, but the image upload quota is still full, so this report does not have photos that we would have liked to attach. This week, I made adjustments to the servo mounting, and added in holes to accomodate the heatset inserts to the lid Read more…

By stellai, 1 month ago
Stella's Status Reports

Stella’s Status Report for November 8, 2025

This week, I adjusted the inserts of the main Visor body to fit the basket more flush. I also condensed the sensor cavity because the top opening just needed to accomodate the mounted sensors.   Because the sensor cavity combined with the main body was too big for the printer Read more…

By stellai, 1 month ago
Stella's Status Reports

Stella’s Status Report for November 1, 2025

This past week, I worked on designing, modeling, and constructing the air dam prototypes.  The designing took a bit of time because while we were adapting an existing 3d model for the rack and pinion system, we needed to keep a few things in mind. The servos have a maximum Read more…

By stellai, 2 months ago
Stella's Status Reports

Stella’s Status Report for October 25, 2025

This week, I finished a second iteration of the Visor’s sensor cavity and main body 3D models. For the sensor cavity, I included the outer casing for the intake, expanded the size to accomodate the sensors since the first iteration was too small, and started working on creating lids. For Read more…

By stellai, 2 months ago
Stella's Status Reports

Stella’s Status Report for October 11, 2025

This week, we did a bit of testing with the constructed prototypes. The printed sensor box is a bit too small to house the sensors in the way we want it to, but we should be able to get a lot of mileage out of this prototype for testing. I Read more…

By stellai, 2 months ago
Stella's Status Reports

Stella’s Status Report for October 4, 2025

This week, our parts arrived and we were able to continue to make progress on the hardware side of our project. Our team met with both Sofiya Filippova, who worked on a project similar to ours during her time at BU, and Professor Michael Taylor, whose thesis was on low cost air Read more…

By stellai, 2 months ago
Stella's Status Reports

Stella’s Status Report for September 27, 2025

This week, I helped with working with the API for the ACHD database of air quality measurements. In addition to this, the team and I continued to refine and nail down our design requirements for Jaehyun’s presentation next week, which will be important for our project trajectory. I also started working Read more…

By stellai, 3 months3 months ago
Stella's Status Reports

Stella’s Status Report for September 20, 2025

This week, Jaehyun, John, and I continued to refine our parts list. We specifically focused on our planned LoRa network, researching how to use LoRaWAN and LoRa, as well as looking into how we wanted to put together our LTE board setup. For the cellular network we are planning to Read more…

By stellai, 3 months3 months ago
Recent Posts
  • Jaehyun’s Status Report for December 6, 2025
  • Team’s Status Report for December 6, 2025
  • Stella’s Status Report for December 6, 2025
  • John’s Status Report for December 6, 2025
  • Team’s Status Report for November 22, 2025
Archives
  • December 2025
  • November 2025
  • October 2025
  • September 2025
Categories
  • Jaehyun's Status Reports
  • John's Status Reports
  • Stella's Status Reports
  • Team Status Reports
  • Uncategorized
Meta
  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
  • Design Review
  • Final Project Documents
  • Introduction and Project Summary
  • Proposal
  • Weekly Status Reports
Hestia | Developed by ThemeIsle