Team’s Status Report for October 4, 2025

A possible risk is that our custom PCB breaking out the mini PCIe pins from the LoRaWAN gateway does not work. This could happen because either the manufacturing of the PCB was faulty, or the design of the PCB causes too much interference/noise that affects the signals negatively. To manage Read more…

By jjalacce, 2 months ago
John's Status Reports

John’s Status Report for October 4, 2025

This week our parts order arrived allowing for us to make forward progress on the hardware side of our project.  Once the parts came in I was able to get our RPIs setup and on the network so that we can ssh allowing for further development. After I was able Read more…

By jjalacce, 2 months2 months ago

Posts navigation

Previous 1 2
Recent Posts
  • Jaehyun’s Status Report for December 6, 2025
  • Team’s Status Report for December 6, 2025
  • Stella’s Status Report for December 6, 2025
  • John’s Status Report for December 6, 2025
  • Team’s Status Report for November 22, 2025
Archives
  • December 2025
  • November 2025
  • October 2025
  • September 2025
Categories
  • Jaehyun's Status Reports
  • John's Status Reports
  • Stella's Status Reports
  • Team Status Reports
  • Uncategorized
Meta
  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
  • Design Review
  • Final Project Documents
  • Introduction and Project Summary
  • Proposal
  • Weekly Status Reports
Hestia | Developed by ThemeIsle