Team Status Report for 10/25

  • What are the most significant risks that could jeopardize the success of the project? How are these risks being managed? What contingency plans are ready?

Our most significant risk for hardware persists from last week: our parts are still not here. However, through some snooping, we were able to find a few replacement parts available on campus (for example, a Camera Module 3 and a button). We have started working with them this week, but how we bring up the parts we ordered and some APIs may differ. This is now our greatest concern in terms of our hardware progress. To mitigate this challenge, we have been looking into the differences between our temporary replacement parts and our desired ones and finding their counterpart functions and more scalable interactions between the software. 

The most significant risk in software persists as well, the accuracy of the models. Similarly, the contingency plans involve gathering more data as explained in the design report/previous status reports. Additionally, if the sunburn model becomes exceedingly difficult to train effectively, this could cause the problem to get off schedule. The contingency plan mainly involves going back to gathering more data, but if that doesn’t solve the problem, then re-reviewing existing solutions and directly implementing them would follow.

  • Were any changes made to the existing design of the system (requirements, block diagram, system spec, etc)? Why was this change necessary, what costs does the change incur, and how will these costs be mitigated going forward?

No changes were made to our existing design in terms of hardware. 

We have been sticking to our plan this week!

  • Provide an updated schedule if changes have occurred.

No change in schedule!