Team Status Report for 12/7

What are the most significant risks that could jeopardize the success of theproject? How are these risks being managed? What contingency plans are ready?

  • Currently, the most significant risk is still going wireless.
  • The contingency plan is to keep the wired connection between this subsystem, while improving upon the subsystem integration (sending recipe steps to the LCD, etc.)

Were any changes made to the existing design of the system (requirements,block diagram, system spec, etc)? Why was this change necessary, what costsdoes the change incur, and how will these costs be mitigated going forward?

  • We may potentially need to stay wired in terms of audio input, which would change the CAD a bit to account for that.
  • Requirements have stayed the same otherwise, as keeping the subsystem wired reduces latency and improves accuracy greatly.