{"id":227,"date":"2024-12-01T15:34:15","date_gmt":"2024-12-01T15:34:15","guid":{"rendered":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/?p=227"},"modified":"2024-12-01T15:34:15","modified_gmt":"2024-12-01T15:34:15","slug":"team-status-report-11-30-24","status":"publish","type":"post","link":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/2024\/12\/01\/team-status-report-11-30-24\/","title":{"rendered":"Team Status Report 11\/30\/24"},"content":{"rendered":"<h4><strong>Summary of Progress:<\/strong><\/h4>\n<p>This week, the team focused on <strong>testing and verification<\/strong> as well as making final adjustments to the product. Our primary tasks included:<\/p>\n<ul>\n<li><strong>Performance Testing:<\/strong>\n<ul>\n<li>Measured system latency, moving speed, and force accuracy.<\/li>\n<li>Verified that all results meet the user case requirements, ensuring the system performs as intended.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Controller Adjustments:<\/strong>\n<ul>\n<li>Developed a new controller frame designed to enclose all cables neatly.<\/li>\n<li>Improved ergonomics, making the controller easier to grasp and operate.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The final results of these tests and adjustments will be presented during next week\u2019s presentation.<\/p>\n<h4><strong>Key Achievements:<\/strong><\/h4>\n<ul>\n<li>Verified system performance, confirming that all metrics align with the user case requirements.<\/li>\n<li>Successfully redesigned the controller frame for improved usability and organization.<\/li>\n<\/ul>\n<h4><strong>Next Steps:<\/strong><\/h4>\n<ul>\n<li>Finalize the presentation, including detailed testing results.<\/li>\n<li>Prepare for the upcoming demo, ensuring all components are fully operational and presentation materials are ready.<\/li>\n<\/ul>\n<h4><strong>Risks and Mitigations:<\/strong><\/h4>\n<ul>\n<li><strong>Risk:<\/strong> Limited time for final presentation preparation.\n<ul>\n<li><strong>Mitigation:<\/strong> All testing and adjustments have been completed, allowing us to dedicate the remaining time to finalizing the presentation and polishing the product.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Summary of Progress: This week, the team focused on testing and verification as well as making final adjustments to the product. Our primary tasks included: Performance Testing: Measured system latency, moving speed, and force accuracy. Verified that all results meet the user case requirements, ensuring the system performs as intended. Controller Adjustments: Developed a new &hellip; <\/p>\n<p class=\"link-more\"><a href=\"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/2024\/12\/01\/team-status-report-11-30-24\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Team Status Report 11\/30\/24&#8221;<\/span><\/a><\/p>\n","protected":false},"author":997,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[3],"tags":[],"_links":{"self":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/posts\/227"}],"collection":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/users\/997"}],"replies":[{"embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/comments?post=227"}],"version-history":[{"count":2,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/posts\/227\/revisions"}],"predecessor-version":[{"id":229,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/posts\/227\/revisions\/229"}],"wp:attachment":[{"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/media?parent=227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/categories?post=227"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/course.ece.cmu.edu\/~ece500\/projects\/f24-teamb1\/wp-json\/wp\/v2\/tags?post=227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}